Press Roller Refurbishment
We recently took on the challenging refurbishment of a 47-ton Press Roller for the aggregate industry, breathing new life into the worn part through precision engineering.
We recently took on the challenging refurbishment of a 47-ton Press Roller for the aggregate industry, breathing new life into the worn part through precision engineering.
Refurbishment and weld reclamation of this huge crusher roll, weighing over 60 tonnes, is about to begin here at Tinsley Bridge.
We offer a single source for the precision engineering of components for oil and gas exploration.
As a company we are adept at overcoming the fabrication and machining challenges of complex and multi layered projects involving design, development and extensive testing to the highest standards.
As an approved Network Rail supplier, Tinsley Bridge manufacture safety critical track switch components and supplies a large range of permanent way and infrastructure items.
A large mill gearbox required urgent rectification following the failure of a key bearing.
Tinsley Bridge have in-house metallurgists and welding engineers with expertise in both materials' science and welding processes.
We know that to ensure the highest quality, a multi-faceted approach is necessary.
Another example of the unrivalled expert knowledge, skillset, expertise, accreditations and innovative technologies here at Tinsley Bridge.
Our meticulous attention to detail, precision and adherence to strict quality standards plus rigorous quality control ensures we meet the demanding requirements required to manufacture precise high specification fabrications.