Pump Base Fabrication Project
A large pump base fabrication weighing 10,000kg has been fabricated, machined and painted by Tinsley Bridge Services
A large pump base fabrication weighing 10,000kg has been fabricated, machined and painted by Tinsley Bridge Services
A massive mill gearbox required urgent rectification following the failure of a key bearing. Response time was critical as the vertical gearbox is key to the operation of a large mill.
Tinsley Bridge with partners Performance Engineering Solutions PES and AMRC Composites Centre will be competing against other ground-breaking projects for a prestigious national engineering innovation award.
An on-site project for a major steel works presented some unique challenges.
Tinsley Bridge have completed a project to enable access to the top of industrial cooling towers and the extraction of cooling fans during vital maintenance routines for a large processing plant.
Tinsley Bridge have collaborated with the Confederation of British Metalforming (CBM) in an approach using Lean Manufacturing to improve operational performance.
Tinsley Bridge’s increased focus is part of plans to invest and develop in the rail infrastructure sector.
Tinsley Bridge have teamed up with The University of Sheffield and Sheffield Engineering Leadership Academy (SELA) in an innovation project. Digital technology was introduced to reduce energy use during the manufacture of automotive suspension components, and to help deliver a green economy for the Sheffield City Region.
Tinsley Bridge have completed an order to design, manufacture and install new platforms to support the powder metals process at Liberty Powder Metals in Middlesbrough.
Tinsley Bridge have manufactured and installed a new expansion joint for a major steel manufacturer, replacing a section damaged in a high level ducting system.