Extralite™ torsion bar
Our innovative Extralite™ torsion bar upgrade for the Warrior & CVR(T) Defence vehicles met an urgent operational requirement for the Ministry of Defence.
Our innovative Extralite™ torsion bar upgrade for the Warrior & CVR(T) Defence vehicles met an urgent operational requirement for the Ministry of Defence.
Tinsley Bridge Service has recently completed a technically demanding contract within a critical time frame at the SMACC Melting Shop, Outokumpu Stainless, Europa Way, Sheffield.
Tinsley Bridge was approached by BAE Systems to see if there was a way to raise ride height of the British Army Warrior Infantry Fighting Vehicle at its increased protection weight, with minimal component changes and with the need to maintain mobility.
A large pump base fabrication weighing 10,000kg has been fabricated, machined and painted by Tinsley Bridge Services
A massive mill gearbox required urgent rectification following the failure of a key bearing. Response time was critical as the vertical gearbox is key to the operation of a large mill.
Tinsley Bridge with partners Performance Engineering Solutions PES and AMRC Composites Centre will be competing against other ground-breaking projects for a prestigious national engineering innovation award.